|
Bid/Proposal
|
Deadline
|
Pre-bid Meeting
|
Trade-in Available
|
Addendum
|
Award To
|
|
Bid-264Roof Replacement-Public Works Building
|
October 9, 2009 @ 11:00AM
|
Call for Appointment
|
No
|
No
|
|
|
Bid-263household Hazardous Waste Bid
|
August 13, 2009 @ 11:00AM
|
No
|
No
|
No
|
Clean venture $15,970.00
|
|
Bid-262ADesktop Computers
|
August 21, 2009 @ 11:00AM
|
No
|
No
|
No
|
Dell Computers
|
|
Bid-263 Household Hazardous Waste
|
August 13, 2009 @ 11:00AM
|
No
|
No
|
No
|
Pending
|
|
RFP-262 Desktop Computers
|
August 10, 2009 @ 3:00PM
|
No
|
No
|
No
|
No Award
|
|
Bid-261 Senior Center & Arlington Pond Pump Station Generators
|
August 21, 2009 @ 11:00AM
|
Mandatory Pre-Bid August 4, 2009 @ 9:00AM & 10:00AM
|
No
|
No
|
Pending
|
|
Bid-260 Roof Replacement Fire Station #3
|
August 17, 2009 @ 11:00AM
|
No
|
No
|
No
|
A&P Home Improvement Salem, NH $8,100.00
|
|
Bid-259 Haigh Ave Retaining Wall Project
|
July 27, 2009 @ 11:00AM
|
Mandatory July 22, 2009 @ 10:00AM
|
No
|
No
|
Morello Construction $14,285.00
|
|
RFP-258 Engineering Services - Hedgehog Park
|
July 8, 2009 @ 3:00PM
|
Yes
|
No
|
No
|
Gary Marshall Architects
|
|
Bid-257 HP Designjet Printer
|
June 22, 2009 @ 11:00AM
|
Yes
|
No
|
No
|
DavTech Computer $11,300.00
|
|
Bid-256 Demolition of Kinsler Building
|
June 26, 2009 @ 11:00AM
|
June 19, 2009 @ 10:00AM
|
No
|
No
|
All-Ways Wrecking $17,315.00
|
|
Bid-255 Six Wheel Cab & Chassis (5)
|
May 15, 2009 @ 1:30PM
|
No
|
No
|
No
|
Liberty International $291,240.00
|
|
Bid-254 Pavement Marking
|
May 14, 2009 @ 11:30AM
|
No
|
No
|
No
|
Hi-Way Safety
|
|
Bid-253 Calcium Chloride 32-35% Solution
|
May 14, 2009 @ 11:00AM
|
No
|
No
|
No
|
Gorman Group $0.95/$1.05
|
|
Bid-252 Infrared Asphalt Restoration
|
May 13, 2009 @ 11:30AM
|
No
|
No
|
No
|
Patches Infrared $25.95 per sq yd
|
|
RFP Cluff Crossing Bridge Replacement
|
May 12, 2009 @ 2:00PM
|
Optional pre-bid
|
No
|
No
|
J. Parker Daughters
|
|
RFP Pelham Road Bridge Construction
|
May 12, 2009 @ 1:00PM
|
Optional pre-bid
|
No
|
Yes
|
Dubois Excavating
|
|
Bid-251 Crushed Stone & Gravel
|
May 13, 2009 @ 11:00AM
|
No
|
No
|
No
|
Brox Industries
|
|
Bid-250 Bituminous Concrete
|
May 11, 2009 @ 11:00AM
|
No
|
No
|
No
|
P.J. Keating
|
|
Bid-249 2009 Asphalt Spreader
|
May 6, 2009 @ 4:00PM
|
No
|
No
|
No
|
American Road Machinery
|
|
Bid-248 2009 Mechanical High Dump Sweeper
|
May 6, 2009 @ 3:30PM
|
No
|
No
|
No
|
H.P. Fairfield $196,500.00
|
|
Bid-247 Heavy Duty Plow w/ Power Angle
|
May 6, 2009 @ 3:00PM
|
No
|
No
|
No
|
Dyar Sales
|
|
Bid-246 Re-mount Plow Equipment/Salter
|
May 6, 2009 @ 2:30PM
|
No
|
No
|
No
|
H.P. Fairfield $42,480.00
|
|
Bid-245 2009 Utility Body
|
May 6, 2009 @ 2:00PM
|
No
|
No
|
No
|
Hews Truck Bodies $6,185.00
|
|
Bid-244 2009 Ton Cab & Chassis 4x4
|
May 6, 2009 @ 1:30PM
|
No
|
No
|
No
|
Stoneham Ford $33,768.00
|
|
Bid-243 Dump Body Sander Combo/Plow Remount
|
May 6, 2009 @ 11:30AM
|
No
|
No
|
No
|
H.P. Fairfield $52,351.00
|
|
Bid-242 2009 1-Ton Dump Body
|
May 6, 2009 @ 11:00AM
|
No
|
No
|
No
|
Donovan Equipment $6,850.00
|
|
Bid-241 2009 F-350 Vehicle Bid
|
May 4, 2009 @ 11:00AM
|
No
|
No
|
No
|
Stoneham Ford $22,130.00
|
|
RFP-240 Engineering Services EPA Stormwater Reporting
|
May 5, 2009 @ 3:00PM
|
No
|
No
|
No
|
Pending
|
|
RFP-239 Engineering Services for Road Improvement Project
|
April 27, 2009 @ 3:00PM
|
No
|
No
|
No
|
Stantec Consulting
|
|
RFP Portable Toilets - Recreation Department
|
April 9, 2009
|
No
|
No
|
No
|
Dave's Septic $2,898.00
|
|
Bid-238 SCADA Upgrades at the Water Treatment Plant
|
April 29, 2009 @ 3:00PM
|
April 14, 2009 @ 10:00AM
|
No
|
No
|
Sheridan Engineering $31,043.00
|
|
Bid-237 Liquid Carbon Dioxide
|
April 27, 2009 @ 2:00PM
|
No
|
No
|
No
|
Air Gas East
|
|
Bid-236 Backwash Pump & Motor Replacement
|
April 17, 2009 @ 3:00PM
|
April 7, 2009 @ 10:00AM
|
No
|
Yes
|
Collins Mechanical $36,844.00
|
|
Bid-235 Wetwell Backwash Tank Cleaning
|
April 16, 2009 @ 11:00AM
|
April 6, 2009 @ 10:00AM
|
No
|
No
|
Rooter-man Wetwell $6,500.00
Back Wash Tank $2,600.00
|
|
Bid-234 Shift Command Vehicle (Chevy Tahoe)
|
April 6, 2009 @ 3:00PM
|
No
|
No
|
No
|
Colonial Auto Group $29,142.00
|
|
Bid-233 Guard Rail
|
March 31, 2009 @ 3:00PM
|
No
|
No
|
No
|
Total Highway Services
|
|
Bid-232 Crown Victoria Interceptor Vehicles (5)
|
March 2, 2009 @ 3:00PM
|
No
|
No
|
No
|
(5) Vehicles (Grappone Ford)
Warranties (Hillsboro Ford)
|